Dear customer,
we ship orders to countries outside Slovakia and the Czech Republic only after full payment for the products and shipping has been received.
Shipping costs are calculated individually based on the destination country and the size of the shipment.
After placing your order, you will be contacted by email with the final shipping price.
Thank you for your understanding.
Ekodiely.skekodiely.sk
Ekodily.czekodily.cz
Ekodiely.comekodiely.com
Current 899 806 products

Dashboard

Peugeot 301 1.6 hdi 99 HP manual 73 kW 1560 cm3 4- Zobrazit: 9813760080 (Prístrojové dosky, displeje)
153,00€ with VAT
125,00 € without VAT
Mazda 5  2005-2010 2.0 16v 145 HP manual 107 kW 1999 cm3 5- Zobrazit:  (Prístrojové dosky, displeje)
46,00€ with VAT
38,00 € without VAT
Mazda 5  2005-2010 2.0 16v 145 HP manual 107 kW 1999 cm3 5- Zobrazit: CC33A (Prístrojové dosky, displeje)
46,00€ with VAT
38,00 € without VAT
Land rover Range Rover sport I L320 3.0 D V6 245KM automatic 180 kW 2993 cm3 5- Zobrazit: AH22-10E887-BE (Prístrojové dosky, displeje)
171,00€ with VAT
140,00 € without VAT
Mazda 6 II GH 2007-2012 2.0 16v 147 HP manual 108 kW 1999 cm3 5- Zobrazit: GAA9611J0 (Prístrojové dosky, displeje)
59,00€ with VAT
48,00 € without VAT
Citroen C4 Grand picasso 2.0 hdi 136 HP automatic 100 kW 1997 cm3 5- Zobrazit: 28112700-1A (Prístrojové dosky, displeje)
64,00€ with VAT
53,00 € without VAT
Chevrolet Aveo T200 2003-2008 1,2.0 8v 72 HP manual 53 kW 1150 cm3 5- Zobrazit:  (Prístrojové dosky, displeje)
46,00€ with VAT
38,00 € without VAT
Ford Kuga II 2013-2019 2.0 tdci 150 HP manual 110 kW 1997 cm3 5- Zobrazit: CJ5T-18B955-FD (Prístrojové dosky, displeje)
151,00€ with VAT
123,00 € without VAT
Ford Fiesta Mk7 2008-2017 1.4 tdci 70 HP manual 51,5 kW 1399 cm3 5- Zobrazit: BA6T-18B955-AC (Prístrojové dosky, displeje)
59,00€ with VAT
48,00 € without VAT
Bmw X5 E70 2006-2013 3.0d 235 HP automatic 173 kW 2993 cm3 5- Zobrazit: E70CCCCP (Prístrojové dosky, displeje)
276,00€ with VAT
225,00 € without VAT
Mercedes S W221 2005-2013 3.0 cdi 235 HP automatic 173 kW 2987 cm3 4- Zobrazit: 1036904816 (Prístrojové dosky, displeje)
64,00€ with VAT
53,00 € without VAT
Renault Fluence 1.6 16V 110 HP manual 81 kW 1598 cm3 4- Zobrazit: 280349044R (Prístrojové dosky, displeje)
59,00€ with VAT
48,00 € without VAT
Alfa romeo Giulietta 1.6 jtdm: 105 HP manual 77 kW 1598 cm3 5- Zobrazit: A2C53118934 (Prístrojové dosky, displeje)
410,00€ with VAT
334,00 € without VAT
Audi A6 C6 2004-2011 2.0 tdi 140 HP automatic 103 kW 1968 cm3 5- Zobrazit: 4F0919603 (Prístrojové dosky, displeje)
59,00€ with VAT
48,00 € without VAT
Peugeot 207 1.4 16V 88 HP manual 65 kW 1360 cm3 5- Zobrazit: 9652415980 (Prístrojové dosky, displeje)
59,00€ with VAT
48,00 € without VAT
Peugeot 508 2010-2018 2.0 HDI 140 HP manual 103 kW 1997 cm3 4- Zobrazit: 9665334380-00 (Prístrojové dosky, displeje)
46,00€ with VAT
38,00 € without VAT
Renault Koleos I 2008-2016 2.0 DCI 173KM manual 127 kW 1995 cm3 5- Zobrazit: 28091JY000 (Prístrojové dosky, displeje)
59,00€ with VAT
48,00 € without VAT
Bmw 5 F10 2010-2017 2.0 N47T 184hp automatic 135 kW 1995 cm3 4- Zobrazit: 9241826 (Prístrojové dosky, displeje)
199,00€ with VAT
162,00 € without VAT
Vw Touareg II 2010-2018 3.0 tdi 245KM automatic 180 kW 2999 cm3 5- Zobrazit: 7P6919603 (Prístrojové dosky, displeje)
331,00€ with VAT
270,00 € without VAT
Volvo V60 I 2010-2018 2.0 D3 163 HP automatic 120 kW 1984 cm3 5- Zobrazit: 31374992 (Prístrojové dosky, displeje)
171,00€ with VAT
140,00 € without VAT
Opel Signum 2.2 dti 125 HP manual 92 kW 2172 cm3 5- Zobrazit: 13154971 (Prístrojové dosky, displeje)
50,00€ with VAT
41,00 € without VAT
Chevrolet Orlando 1.8 16V 141 HP manual 104 kW 1796 cm3 5- Zobrazit: 95192267G (Prístrojové dosky, displeje)
46,00€ with VAT
38,00 € without VAT
Bmw 5 E60 2003-2010 2.0d 150 HP manual 110 kW 1995 cm3 4- Zobrazit: 9111268 (Prístrojové dosky, displeje)
77,00€ with VAT
63,00 € without VAT
Bmw X3 E83 2003-2010 2.0d (M47): 150 HP manual 110 kW 1995 cm3 5- Zobrazit: 3420851 (Prístrojové dosky, displeje)
410,00€ with VAT
334,00 € without VAT
Bmw X1 E84 2009-2015 2.0d 136 HP manual 100 kW 1995 cm3 5- Zobrazit: 2171498 (Prístrojové dosky, displeje)
248,00€ with VAT
202,00 € without VAT
Ford C-Max II 2010-2019 1.6 tdci 116 HP manual 85 kW 1560 cm3 5- Zobrazit: AM5T-18B955-AG (Prístrojové dosky, displeje)
46,00€ with VAT
38,00 € without VAT
Mazda 6 I GG 2002-2007 2.0 citd 143 HP manual 105 kW 1998 cm3 5- Zobrazit: CA-DM45912A (Prístrojové dosky, displeje)
98,00€ with VAT
80,00 € without VAT
Peugeot 308 I 2007-2013 1.6 hdi 90 HP manual 66,2 kW 1560 cm3 5- Zobrazit: 9664483980 (Prístrojové dosky, displeje)
59,00€ with VAT
48,00 € without VAT
Renault Laguna III 2007-2015 2.0 16V 140 HP manual 103 kW 1997 cm3 5- Zobrazit: 259154206R (Prístrojové dosky, displeje)
46,00€ with VAT
38,00 € without VAT